After Saturday’s great work, Sunday the FOSM saw crew led by Sam Beard and including Scott Dietrich, Michael Arndt, Sim Cook, and Cliff Giles continued clearing corridor along a new reroute of a steep section of the old Klaus trail. This week we are continuing with the excavator to level the trail to the south. This reroute section will require a significant amount of leveling, stump pulling and rock work, possibly utilizing some rock cages to create a level base on the lower side of the trail. Likely we will be organizing a Saturday work group for Aug. 6 so stay tuned for that announcement.